Resume Workflow Run
glue_resume_workflow_run | R Documentation |
Restarts selected nodes of a previous partially completed workflow run and resumes the workflow run¶
Description¶
Restarts selected nodes of a previous partially completed workflow run and resumes the workflow run. The selected nodes and all nodes that are downstream from the selected nodes are run.
Usage¶
glue_resume_workflow_run(Name, RunId, NodeIds)
Arguments¶
Name |
[required] The name of the workflow to resume. |
RunId |
[required] The ID of the workflow run to resume. |
NodeIds |
[required] A list of the node IDs for the nodes you want to restart. The nodes that are to be restarted must have a run attempt in the original run. |
Value¶
A list with the following syntax:
list(
RunId = "string",
NodeIds = list(
"string"
)
)
Request syntax¶
svc$resume_workflow_run(
Name = "string",
RunId = "string",
NodeIds = list(
"string"
)
)